222 Henry Street, Brooklyn, New York City: Residential Project Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Residential Project Renovation at 222 Henry Street, Brooklyn, New York City was filed with New York City on October 21, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Alt-co filed to change existing prior-to-1968 code, class 3 nfp, haca dwelling from 5 families to 3 families. new certificate of occupancy to be obtained. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address222 Henry Street, Brooklyn, New York City
ProjectResidential Project Renovation
Building typeResidential
WorkRenovation or alteration
Filed with the cityOctober 21, 2026
City statusNot yet approved (DOB status: Plan Examiner Review)
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Alt-co filed to change existing prior-to-1968 code, class 3 nfp, haca dwelling from 5 families to 3 families. new certificate of occupancy to be obtained”

Where this project is

  1. August 12, 2026Alteration CO: fire protection
  2. August 17, 2026Alteration CO: structural work
  3. August 25, 2026Alteration CO: mechanical
  4. August 25, 2026Alteration CO: plumbing
  5. September 1, 2026Alteration CO: foundation · under $1M
  6. October 21, 2026Alteration CO: Residential Project Renovation · under $1M (this page)
  7. November 2026Estimated construction start (estimate)
  8. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 98 Montague Street, BrooklynAlteration CO: conversion to residential · $50M to $100M · October 2026
  • 360 Adams Street, BrooklynAlteration: facade work · $10M to $25M · April 2026
  • 126 Myrtle Avenue, BrooklynAlteration CO: structural work · $10M to $25M · July 2026
  • 422 Fulton Street, BrooklynInterior alteration · $10M to $25M · July 2026
  • 210 Joralemon Street, BrooklynAlteration: structural work · $5M to $10M · March 2026

43 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Nov 2026 – May 2027Estimate
Excavation and Site WorkNov 2026Coming up
Construction Site SecurityNov 2026 – Dec 2026Coming up
Concrete and FoundationNov 2026Coming up
Structural SteelNov 2026 – Dec 2026Coming up
ElevatorsNov 2026 – Dec 2026Coming up
FramingNov 2026 – Dec 2026Coming up
PaintingNov 2026 – Jan 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 222 Henry Street, Brooklyn?

Residential Project Renovation. Alt-co filed to change existing prior-to-1968 code, class 3 nfp, haca dwelling from 5 families to 3 families. new certificate of occupancy to be obtained

Has 222 Henry Street, Brooklyn been permitted?

Not yet. The work was filed with New York City on October 21, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).

Who is building 222 Henry Street, Brooklyn?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 222 Henry Street, Brooklyn need now?

Estimated as of October 2026, none is open yet. Coming up: excavation and site work from November 2026; site security from November 2026; concrete from November 2026; structural steel from November 2026; elevator from November 2026; framing from November 2026; painting from November 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.