2409 Adam Clayton Powell Jr Boulevard, Manhattan, New York City: 5-Storey Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

5-Storey Apartment Building Renovation at 2409 Adam Clayton Powell Jr Boulevard, Manhattan, New York City was permitted on August 5, 2026 with a stated construction value of under $1M. Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes to use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2409 Adam Clayton Powell Jr Boulevard, Manhattan, New York City |
| Project | 5-Storey Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 5, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes to use, egress, or occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 26, 2026Alteration: mechanical · under $1M
- August 5, 2026Alteration: 5-Storey Apartment Building Renovation · under $1M (this page)
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (May 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 103 West 141 Street, ManhattanAlteration CO: structural work · $10M to $25M · April 2026
- 2581 Adam Clayton Powell Jr Boulevard, ManhattanAlteration: roofing · $5M to $10M · September 2026
- 301 West 140 Street, ManhattanAlteration · $5M to $10M · September 2026
- 160 Convent Avenue, ManhattanAlteration: elevator · $5M to $10M · March 2026
- 102 Bradhurst Avenue, ManhattanAlteration: facade work · $5M to $10M · March 2026
41 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Excavation and Site Work | May 2026 – Jun 2026 | Window passed (est.) |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 – Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1 Fifth Avenue, Manhattan: Apartment Building Renovation
- 198 Windsor Place, Brooklyn: Duplex Renovation
- 252a 22 Street, Brooklyn: Single-Family House Renovation
- 22 Wheeling Avenue, Staten Island: Single-Family House Renovation
- 201 Wilson Avenue, Brooklyn: 3-Storey Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2409 Adam Clayton Powell Jr Boulevard, Manhattan?
5-Storey Apartment Building Renovation. Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes to use, egress, or occupancy
When was the permit issued for 2409 Adam Clayton Powell Jr Boulevard, Manhattan?
August 5, 2026, by New York City.
Who is building 2409 Adam Clayton Powell Jr Boulevard, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2409 Adam Clayton Powell Jr Boulevard, Manhattan need now?
Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
