247 Saint Nicholas Avenue, Brooklyn, New York City: 3-Storey Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

3-Storey Apartment Building Renovation at 247 Saint Nicholas Avenue, Brooklyn, New York City was filed with New York City on October 6, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Renovation with proposed split hvac systems of existing 3 family, 3 story w/ cellar residential building. no change in use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address247 Saint Nicholas Avenue, Brooklyn, New York City
Project3-Storey Apartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Filed with the cityOctober 6, 2026
City statusNot yet approved (DOB status: Plan Examiner Review)
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitUrena Const & Design Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Renovation with proposed split hvac systems of existing 3 family, 3 story w/ cellar residential building. no change in use, egress, or occupancy”

Where this project is

  1. June 2, 2026Interior alteration · under $1M
  2. October 6, 2026Alteration: plumbing · under $1M
  3. October 6, 2026Alteration: 3-Storey Apartment Building Renovation · under $1M (this page)
  4. June 2026Estimated construction start (estimate)
  5. January 2027Estimated completion (estimate)

How we estimate: from the same company's first permit at this address (June 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 5 more renovations within 1 km

  • 231 Palmetto Street, BrooklynInterior alteration · $1M to $5M · May 2026
  • 378 Seneca Avenue, QueensAlteration: roofing · $1M to $5M · October 2026
  • 515 Knickerbocker Avenue, BrooklynAlteration: excavation and shoring · $1M to $5M · September 2026
  • 1474 Gates Avenue, BrooklynAlteration: facade work · $1M to $5M · August 2026
  • 374 Stockholm Street, BrooklynAlteration: mechanical · $1M to $5M · April 2026

11 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Urena Const & Design Inc. has 34 other projects in Builtie

  • New York City · Interior alteration · under $1M · 2026
  • New York City · Interior alteration · under $1M · 2026
  • New York City · Interior alteration · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Jan 2027Estimate
Excavation and Site WorkMay 2026 – Jun 2026Window passed (est.)
Construction Site SecurityMay 2026 – Jul 2026Window passed (est.)
Concrete and FoundationJun 2026Window passed (est.)
Structural SteelJun 2026 – Jul 2026Window passed (est.)
ElevatorsJun 2026 – Jul 2026Window passed (est.)
FramingJun 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 247 Saint Nicholas Avenue, Brooklyn?

3-Storey Apartment Building Renovation. Renovation with proposed split hvac systems of existing 3 family, 3 story w/ cellar residential building. no change in use, egress, or occupancy

Has 247 Saint Nicholas Avenue, Brooklyn been permitted?

Not yet. The work was filed with New York City on October 6, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).

Who is building 247 Saint Nicholas Avenue, Brooklyn?

Urena Const & Design Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 247 Saint Nicholas Avenue, Brooklyn need now?

Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.