253 West 73 Street, Manhattan, New York City: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Apartment Building Renovation at 253 West 73 Street, Manhattan, New York City was permitted on October 14, 2026 with a stated construction value of under $1M. Hereby filing for the interior renovation to combine two residential apartments, unit 9fg. no change to use occupancy or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address253 West 73 Street, Manhattan, New York City
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedOctober 14, 2026
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Hereby filing for the interior renovation to combine two residential apartments, unit 9fg. no change to use occupancy or egress”

Where this project is

  1. May 8, 2026Alteration: plumbing · under $1M
  2. May 8, 2026Alteration: plumbing · under $1M
  3. September 29, 2026Alteration: plumbing · under $1M
  4. October 14, 2026Alteration: Apartment Building Renovation · under $1M (this page)
  5. October 15, 2026Alteration: plumbing · under $1M
  6. October 2026Estimated construction start (estimate)
  7. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 170 Central Park West, ManhattanAlteration CO: addition · $25M to $50M · August 2026
  • 77 West 66 Street, ManhattanDemolition · $10M to $25M · March 2026
  • 1980 Broadway, ManhattanAlteration CO: interior alteration · $10M to $25M · September 2026
  • 47 West 66 Street, ManhattanDemolition · $5M to $10M · April 2026
  • 36 West 66 Street, ManhattanAlteration CO · $5M to $10M · August 2026

37 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – May 2027Estimate
Excavation and Site WorkOct 2026Approach now
Construction Site SecurityOct 2026 – Nov 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelOct 2026 – Nov 2026Approach now
ElevatorsOct 2026 – Dec 2026Approach now
FramingOct 2026 – Dec 2026Approach now
PaintingNov 2026 – Jan 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 253 West 73 Street, Manhattan?

Apartment Building Renovation. Hereby filing for the interior renovation to combine two residential apartments, unit 9fg. no change to use occupancy or egress

When was the permit issued for 253 West 73 Street, Manhattan?

October 14, 2026, by New York City.

Who is building 253 West 73 Street, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 253 West 73 Street, Manhattan need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing. Coming up: painting from November 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.