257 Central Park West, Manhattan, New York City: Apartment Building Renovation

Apartment Building Renovation at 257 Central Park West, Manhattan, New York City was permitted on September 21, 2026 with a stated construction value of under $1M. At 9th floor apt 9a- interior renovation, removal and installation of non bearing interior partitions and related electrical work. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 257 Central Park West, Manhattan, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | September 21, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “At 9th floor apt 9a- interior renovation, removal and installation of non bearing interior partitions and related electrical work”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 17, 2026Alteration: site protection
- September 21, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- September 21, 2026Alteration: plumbing · under $1M
- October 6, 2026Interior alteration · under $1M
- October 6, 2026Alteration: plumbing · under $1M
- October 2026Estimated construction start (estimate)
- April 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 170 Central Park West, ManhattanAlteration CO: addition · $25M to $50M · August 2026
- 1000 5 Avenue, ManhattanAlteration: addition · $25M to $50M · July 2026
- 361 Central Park West, ManhattanAlteration CO · $10M to $25M · March 2026
- 1014 5 Avenue, ManhattanAlteration CO · $10M to $25M · August 2026
- 214 West 80 Street, ManhattanAlteration CO: conversion to residential · $5M to $10M · April 2026
37 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2026 – Apr 2027 | Estimate |
| Excavation and Site Work | Oct 2026 | Approach now |
| Construction Site Security | Oct 2026 – Nov 2026 | Approach now |
| Concrete and Foundation | Oct 2026 | Approach now |
| Structural Steel | Oct 2026 – Nov 2026 | Approach now |
| Elevators | Oct 2026 – Nov 2026 | Approach now |
| Framing | Oct 2026 – Nov 2026 | Approach now |
| Painting | Oct 2026 – Dec 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 32 West 82 Street, Manhattan: Apartment Building Renovation
- 629 Jefferson Avenue, Brooklyn: 4-Storey Apartment Building Renovation
- 2465 Adam Clayton Powell Jr Boulevard, Manhattan: 5-Storey Apartment Building Renovation
- 2469 Adam Clayton Powell Jr Boulevard, Manhattan: 5-Storey Apartment Building Renovation
- 2473 Adam Clayton Powell Jr Boulevard, Manhattan: 5-Storey Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 257 Central Park West, Manhattan?
Apartment Building Renovation. At 9th floor apt 9a- interior renovation, removal and installation of non bearing interior partitions and related electrical work
When was the permit issued for 257 Central Park West, Manhattan?
September 21, 2026, by New York City.
Who is building 257 Central Park West, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 257 Central Park West, Manhattan need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing; painting.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.