31-08 Steinway Street, Queens, New York City: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 31-08 Steinway Street, Queens, New York City was permitted on August 24, 2026 with a stated construction value of under $1M. Interior tenant fit out for retail store including new interior partition walls, new fixtures, and finishes as shown on drawings filed herewith. no chagne or occupancy, use or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 31-08 Steinway Street, Queens, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | August 24, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior tenant fit out for retail store including new interior partition walls, new fixtures, and finishes as shown on drawings filed herewith. no chagne or occupancy, use or egress”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since June 202617 other permits at this address
- June 15, 2026Alteration: fire protection · under $1M
- June 15, 2026Alteration: facade work · $1M to $5M
- August 20, 2026Alteration: fire protection · under $1M
- August 24, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- August 24, 2026Alteration: addition · $1M to $5M
- October 22, 2026Alteration: fire protection · under $1M
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 31-05 49 Street, QueensAlteration · $5M to $10M · July 2026
- 30-33 29 Street, QueensNew building · $5M to $10M · April 2026
- 37-11 35 Avenue, QueensAlteration: roofing · $1M to $5M · October 2026
- 25-25 31 Avenue, QueensNew construction · $1M to $5M · May 2026
- 34-29 37 Street, QueensNew construction: excavation and shoring · $1M to $5M · September 2026
7 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has another project in Builtie, with 2 permits
- ████████ ConstructionNew York · Mechanical · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Sep 2026 | Window passed (est.) |
| Construction Site Security | Sep 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Sep 2026 – Oct 2026 | Approach now |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Oct 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 7 Madison Street, Manhattan: Retail Building Renovation
- 197-18 Hillside Avenue, Queens: Retail Building Renovation
- 611 Washington Street, Manhattan: Commercial Project Renovation
- 2477 Adam Clayton Powell Jr Boulevard, Manhattan: 5-Storey Apartment Building Renovation
- 710 Croes Avenue, Bronx: 6-Storey Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 31-08 Steinway Street, Queens?
Office and Tenant Fit-Out. Interior tenant fit out for retail store including new interior partition walls, new fixtures, and finishes as shown on drawings filed herewith. no chagne or occupancy, use or egress
When was the permit issued for 31-08 Steinway Street, Queens?
August 24, 2026, by New York City.
Who is building 31-08 Steinway Street, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 31-08 Steinway Street, Queens need now?
Estimated as of October 2026, the trades to approach now are site security, concrete, structural steel, elevator, framing and painting. Already passed: excavation and site work.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
