310 West 75 Street, Manhattan, New York City: School Renovation

School Renovation at 310 West 75 Street, Manhattan, New York City was permitted on June 9, 2026 with a stated construction value of under $1M. Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 310 West 75 Street, Manhattan, New York City |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 9, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 20264 other permits at this address
- March 9, 2026Alteration: fire protection · under $1M
- March 9, 2026Interior alteration · under $1M
- April 30, 2026Alteration CO · under $1M
- June 5, 2026Alteration: structural work · under $1M
- June 9, 2026Alteration: School Renovation · under $1M (this page)
- October 14, 2026Alteration: roofing · under $1M
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 170 Central Park West, ManhattanAlteration CO: addition · $25M to $50M · August 2026
- 1980 Broadway, ManhattanAlteration CO: interior alteration · $10M to $25M · September 2026
- 214 West 80 Street, ManhattanAlteration CO: conversion to residential · $5M to $10M · April 2026
- 160 West 66 Street, ManhattanAlteration: roofing · $5M to $10M · October 2026
- 466 West End Avenue, ManhattanAlteration: mechanical · $1M to $5M · August 2026
24 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 4260 Arthur Kill Road, Staten Island: Retail Building Renovation
- 1516 Greene Avenue, Brooklyn: Apartment Building Renovation
- 100 Morton Street, Manhattan: Townhomes Renovation
- 1122 Lexington Avenue, Manhattan: Restaurant Renovation
- 1629 Park Place, Brooklyn: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 310 West 75 Street, Manhattan?
School Renovation. Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress
When was the permit issued for 310 West 75 Street, Manhattan?
June 9, 2026, by New York City.
Who is building 310 West 75 Street, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 310 West 75 Street, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.