3365 N Deronda Dr, Los Angeles: 3-Storey Single-Family House
Follow this project · we email you when its status or build stage changes

3-Storey Single-Family House at 3365 N Deronda Dr, Los Angeles was permitted on July 24, 2025 with a stated construction value of $1M to $5M. New single-family house, 3 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3365 N Deronda Dr, Los Angeles |
| Project | 3-Storey Single-Family House |
| Building type | Residential |
| Work | New building |
| Storeys | 3 |
| Permit issued | July 24, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Los Angeles once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 24, 2025New home: 3-Storey Single-Family House · $1M to $5M (this page)
- July 28, 2025Grading · under $1M
- November 19, 2025New construction · under $1M
- February 6, 2026Pool · under $1M
- August 2025Estimated construction start (estimate)
- August 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2025 – Aug 2026 | Estimate |
| Fire Protection | Oct 2025 – Dec 2025 | Window passed (est.) |
| Signage and Wayfinding | Jan 2026 – Apr 2026 | Window passed (est.) |
| Insulation | Nov 2025 – Jan 2026 | Window passed (est.) |
| Drywall | Nov 2025 – Feb 2026 | Window passed (est.) |
| Low Voltage and Data | Nov 2025 – Feb 2026 | Window passed (est.) |
| Tile | Dec 2025 – Feb 2026 | Window passed (est.) |
| Cabinetry and Millwork | Nov 2025 – Feb 2026 | Window passed (est.) |
| Flooring | Dec 2025 – Feb 2026 | Window passed (est.) |
| Countertops | Dec 2025 – Feb 2026 | Window passed (est.) |
| Finish Carpentry | Dec 2025 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2025) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Los Angeles
Leads for your trade: every trade in Los Angeles.
More projects: every Los Angeles project of $1M+ by address · major projects in Los Angeles.
Compare tools: The Best Construction Lead Generation Software in California.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 1001 W Pacific Coast Hwy: Retail Building Renovation
- 10100 W Santa Monica Blvd 8th Flr: Office and Tenant Fit-Out
- 1114 S Abbot Kinney Blvd: Office and Tenant Fit-Out
- 1116 S Harbor Blvd: Office and Tenant Fit-Out
- 1177 N Embury St: 2-Storey Residential Project
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3365 N Deronda Dr?
3-Storey Single-Family House. New single-family house, 3 storeys.
When was the permit issued for 3365 N Deronda Dr?
July 24, 2025, by the City of Los Angeles.
Who is building 3365 N Deronda Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3365 N Deronda Dr need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
