37-11 21 Avenue, Queens, New York City: Institutional Project Renovation

Institutional Project Renovation at 37-11 21 Avenue, Queens, New York City was permitted on September 21, 2026 with a stated construction value of under $1M. Rehabilitation of existing Library - New doors, flooring, ceilings and finishes. New ADA compliant ramp ad steps at Entrance 3. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 37-11 21 Avenue, Queens, New York City |
| Project | Institutional Project Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | September 21, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Rehabilitation of existing Library - New doors, flooring, ceilings and finishes. New ADA compliant ramp ad steps at Entrance 3”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 21, 2026Alteration: Institutional Project Renovation · under $1M (this page)
- September 23, 2026Alteration: plumbing · under $1M
- September 30, 2026Alteration · under $1M
- October 16, 2026Alteration · under $1M
- October 21, 2026Alteration: electrical
- October 2026Estimated construction start (estimate)
- April 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 3 more renovations within 1 km
- 31-01 20 Avenue, QueensAlteration · $10M to $25M · May 2026
- 23-70 31 Street, QueensAlteration: facade work · $10M to $25M · May 2026
- 22-45 41 Street, QueensAlteration: foundation · $5M to $10M · July 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has 61 other projects in Builtie
- ████████ ConstructionNew York City · Alteration: mechanical · $10M to $25M · 2026
- ████████ ConstructionNew York City · Alteration: roofing · $5M to $10M · 2026
- ████████ ConstructionNew York City · Alteration: foundation · $5M to $10M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2026 – Apr 2027 | Estimate |
| Excavation and Site Work | Oct 2026 | Approach now |
| Construction Site Security | Oct 2026 – Nov 2026 | Approach now |
| Concrete and Foundation | Oct 2026 | Approach now |
| Structural Steel | Oct 2026 – Nov 2026 | Approach now |
| Elevators | Oct 2026 – Nov 2026 | Approach now |
| Framing | Oct 2026 – Nov 2026 | Approach now |
| Painting | Oct 2026 – Dec 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1 East 75 Street, Manhattan: Residential Project Renovation
- 1 Whitehall Street, Manhattan: Office-to-Residential Conversion
- 101 Lafayette Avenue, Brooklyn: Apartment Building Renovation
- 10250 Foster Avenue, Brooklyn: Warehouse Renovation
- 1133 Lexington Avenue, Manhattan: Residential Project Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 37-11 21 Avenue, Queens?
Institutional Project Renovation. Rehabilitation of existing Library - New doors, flooring, ceilings and finishes. New ADA compliant ramp ad steps at Entrance 3
When was the permit issued for 37-11 21 Avenue, Queens?
September 21, 2026, by New York City.
Who is building 37-11 21 Avenue, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 37-11 21 Avenue, Queens need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing; painting.