40-46 24 Street, Queens, New York City: Mixed-Use Building Renovation
Follow this project · we email you when its status or build stage changes

Mixed-Use Building Renovation at 40-46 24 Street, Queens, New York City was permitted on August 17, 2026 with a stated construction value of under $1M. Proposed interior renovation and change of occupancy / use for first floor space of an existing six (6) story + cellar mixed-use building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 40-46 24 Street, Queens, New York City |
| Project | Mixed-Use Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 17, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior renovation and change of occupancy / use for first floor space of an existing six (6) story + cellar mixed-use building”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 17, 2026Alteration CO: Mixed-Use Building Renovation · under $1M (this page)
- August 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 29-10 Thomson Avenue, QueensAlteration CO: interior alteration · $25M to $50M · September 2026
- 28-01 41 Avenue, QueensAlteration: roofing · $10M to $25M · September 2026
- 23-10 43 Avenue, QueensAlteration CO: structural work · $10M to $25M · September 2026
- 24-01 Queens Plaza North, QueensNew building · $10M to $25M · March 2026
- 37-42 30 Street, QueensNew building · $5M to $10M · July 2026
15 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 6 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Oct 2026 | Approach now |
| Framing | Aug 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Elevators leads in New York City · Framing leads in New York City · Painting leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1148 Coney Island Avenue, Brooklyn: Retail Building Renovation
- 114-34 167 Street, Queens: Two-Family House Renovation
- 79-52 213 Street, Queens: Single-Family House Renovation
- 405 Miller Avenue, Brooklyn: Two-Family House Renovation
- 75-11 Myrtle Avenue, Queens: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 40-46 24 Street, Queens?
Mixed-Use Building Renovation. Proposed interior renovation and change of occupancy / use for first floor space of an existing six (6) story + cellar mixed-use building
When was the permit issued for 40-46 24 Street, Queens?
August 17, 2026, by New York City.
Who is building 40-46 24 Street, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 40-46 24 Street, Queens need now?
Estimated as of October 2026, the trades to approach now are elevator, framing and painting. Already passed: excavation and site work; site security; concrete; structural steel; masonry; waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
