4270 Little Canoe Channel NE, Seattle: Campus Building

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Campus Building at 4270 Little Canoe Channel NE, Seattle was permitted on February 10, 2025 with a stated construction value of $25M to $50M. Phased Project: Construct mixed-use student housing building [UW HAGGETT HALL] on institutional campus [UNIVERSITY OF WASHINGTON] occupy per plan. Mechanical included with Phase 2. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address4270 Little Canoe Channel NE, Seattle
ProjectCampus Building
Building typeCommercial
WorkNew building
Permit issuedFebruary 10, 2025
Stated construction value$25M to $50M
Estimated stageFraming
Company named on the permitAnderen Construction
Decision makers and contactsIn Builtie

From the permit: “Phased Project: Construct mixed-use student housing building [UW HAGGETT HALL] on institutional campus [UNIVERSITY OF WASHINGTON] occupy per plan. Mechanical included with Phase 2”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Seattle

All of them: construction projects in Seattle by address. Seattle's feed rarely names the builder: 1.4% of new-build permits carry one. Builtie resolves the company behind a Seattle project from other records, and does not publish a Seattle builder count because it would describe the feed rather than the market.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 4270 Little Canoe Channel NE?

Campus Building. Phased Project: Construct mixed-use student housing building [UW HAGGETT HALL] on institutional campus [UNIVERSITY OF WASHINGTON] occupy per plan. Mechanical included with Phase 2

When was the permit issued for 4270 Little Canoe Channel NE?

February 10, 2025, by the City of Seattle.

Who is building 4270 Little Canoe Channel NE?

Anderen Construction is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 4270 Little Canoe Channel NE need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.