43 Montauk Avenue, Brooklyn, New York City: Two-Family House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Two-Family House Renovation at 43 Montauk Avenue, Brooklyn, New York City was filed with New York City on August 12, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). Renovation or addition to a two-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address43 Montauk Avenue, Brooklyn, New York City
ProjectTwo-Family House Renovation
Building typeResidential
WorkRenovation or alteration
Filed with the cityAugust 12, 2026
City statusNot yet approved (DOB status: Objections)
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. August 12, 2026Alteration: Two-Family House Renovation · under $1M (this page)
  2. August 2026Estimated construction start (estimate)
  3. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

6 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 6 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Mar 2027Estimate
Excavation and Site WorkAug 2026Window passed (est.)
Construction Site SecurityAug 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Oct 2026Approach now
FramingAug 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 43 Montauk Avenue, Brooklyn?

Two-Family House Renovation. Renovation or addition to a two-family house.

Has 43 Montauk Avenue, Brooklyn been permitted?

Not yet. The work was filed with New York City on August 12, 2026; the city has not approved it yet (DOB status: Objections).

Who is building 43 Montauk Avenue, Brooklyn?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 43 Montauk Avenue, Brooklyn need now?

Estimated as of October 2026, the trades to approach now are elevator, framing and painting. Already passed: excavation and site work; site security; concrete; structural steel; masonry; waterproofing.