474 Irving Avenue, Brooklyn, New York City: Residential Project Renovation
Follow this project · we email you when its status or build stage changes

Residential Project Renovation at 474 Irving Avenue, Brooklyn, New York City was filed with New York City on September 3, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Interior renovation in existing (3) three story including basement. (3) three-family building. no change in use, means of egress or occupancy in this application. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 474 Irving Avenue, Brooklyn, New York City |
| Project | Residential Project Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Filed with the city | September 3, 2026 |
| City status | Not yet approved (DOB status: Plan Examiner Review) |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | J S Remodeling NY Inc. See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior renovation in existing (3) three story including basement. (3) three-family building. no change in use, means of egress or occupancy in this application”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- April 22, 2026Interior alteration · under $1M
- April 28, 2026Alteration: plumbing · under $1M
- July 7, 2026Alteration: plumbing · under $1M
- September 3, 2026Alteration: Residential Project Renovation · under $1M (this page)
- May 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (April 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 231 Palmetto Street, BrooklynInterior alteration · $1M to $5M · May 2026
- 16-63 Cody Avenue, QueensAlteration: structural work · $1M to $5M · July 2026
- 242 Cooper Street, BrooklynAlteration · $1M to $5M · March 2026
- 77 Woodbine Street, BrooklynNew building · $1M to $5M · March 2026
- 515 Knickerbocker Avenue, BrooklynAlteration: excavation and shoring · $1M to $5M · September 2026
10 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
J S Remodeling NY Inc. has 9 other projects in Builtie
- New York City · Alteration CO: conversion to residential · $1M to $5M · 2026
- New York City · Alteration CO: conversion to residential · under $1M · 2026
- New York City · Interior alteration · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Nov 2026 | Estimate |
| Excavation and Site Work | Apr 2026 – May 2026 | Window passed (est.) |
| Construction Site Security | Apr 2026 – Jun 2026 | Window passed (est.) |
| Concrete and Foundation | Apr 2026 – May 2026 | Window passed (est.) |
| Structural Steel | May 2026 – Jun 2026 | Window passed (est.) |
| Elevators | May 2026 – Jun 2026 | Window passed (est.) |
| Framing | May 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | May 2026 – Jun 2026 | Window passed (est.) |
| Waterproofing | May 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 2146 Nostrand Avenue, Brooklyn: Office and Tenant Fit-Out
- 725 East 23 Street, Brooklyn: Institutional Project Renovation
- 63 Goodwin Avenue, Staten Island: Single-Family House Renovation
- 11-15 Malba Drive, Queens: Single-Family House Renovation
- 187 Bay 26 Street, Brooklyn: Duplex Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 474 Irving Avenue, Brooklyn?
Residential Project Renovation. Interior renovation in existing (3) three story including basement. (3) three-family building. no change in use, means of egress or occupancy in this application
Has 474 Irving Avenue, Brooklyn been permitted?
Not yet. The work was filed with New York City on September 3, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).
Who is building 474 Irving Avenue, Brooklyn?
J S Remodeling NY Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 474 Irving Avenue, Brooklyn need now?
Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.