5833 86 Av SE, Calgary: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 5833 86 Av SE, Calgary was permitted on March 30, 2025 with a stated construction value of $25M to $50M. Construction of a new 2 storey control centre and office space 1930 square meters in building area. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 5833 86 Av SE, Calgary |
| Project | Office and Tenant Fit-Out |
| Building type | Industrial |
| Work | New building |
| Permit issued | March 30, 2025 |
| Stated construction value | $25M to $50M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Construction of a new 2 storey control centre and office space 1930 square meters in building area”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 1816 33 St SE: 10-Storey Apartment Building
- 3450 Sarcee Rd SW: Apartment Building
- 4825 Mount Royal Ga SW: School Renovation
- 3841 University Av NW: 6-Storey Apartment Building
- 1488 17 Av SW: 6-Storey Apartment Building
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 5833 86 Av SE?
Office and Tenant Fit-Out. Construction of a new 2 storey control centre and office space 1930 square meters in building area
When was the permit issued for 5833 86 Av SE?
March 30, 2025, by the City of Calgary.
Who is building 5833 86 Av SE?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 5833 86 Av SE need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
