584 Driggs Avenue, Brooklyn, New York City: School Renovation

School Renovation at 584 Driggs Avenue, Brooklyn, New York City was permitted on June 17, 2026 with a stated construction value of under $1M. Filing for interior and exterior renovation to an existing school at the basement and 1st floor. Work includes new openings and partial removal of stair bulkhead, finish work. No change to use or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 584 Driggs Avenue, Brooklyn, New York City |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 17, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Filing for interior and exterior renovation to an existing school at the basement and 1st floor. Work includes new openings and partial removal of stair bulkhead, finish work. No change to use or occupancy”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 17, 2026Alteration: School Renovation · under $1M (this page)
- July 29, 2026Alteration · under $1M
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 597 Grand Street, BrooklynNew construction · $10M to $25M · April 2026
- 280 Kent Avenue, BrooklynAlteration: plumbing · $10M to $25M · March 2026
- 320 Manhattan Avenue, BrooklynAlteration: roofing · $5M to $10M · March 2026
- 130 Berry Street, BrooklynInterior alteration · $5M to $10M · May 2026
- 228 North 7 Street, BrooklynAlteration CO: conversion to residential · $1M to $5M · April 2026
28 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has 4 other projects in Builtie
- ████████ ConstructionNew York City · Alteration CO: interior alteration · $1M to $5M · 2026
- ████████ ConstructionNew York City · Alteration: mechanical · under $1M · 2026
- ████████ ConstructionNew York City · Alteration: fire protection · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 216 Grand Street, Brooklyn: 3-Storey Mixed-Use Building Renovation
- 2930 Wallace Avenue, Bronx: Office-to-Residential Conversion
- 1686 Davidson Avenue, Bronx: 8-Storey Apartment Building
- 66-26 Metropolitan Avenue, Queens: Retail Building Renovation
- 211 Nostrand Avenue, Brooklyn: Mixed-Use Building
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 584 Driggs Avenue, Brooklyn?
School Renovation. Filing for interior and exterior renovation to an existing school at the basement and 1st floor. Work includes new openings and partial removal of stair bulkhead, finish work. No change to use or occupancy
When was the permit issued for 584 Driggs Avenue, Brooklyn?
June 17, 2026, by New York City.
Who is building 584 Driggs Avenue, Brooklyn?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 584 Driggs Avenue, Brooklyn need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.