66-26 Metropolitan Avenue, Queens, New York City: Retail Building Renovation

Retail Building Renovation at 66-26 Metropolitan Avenue, Queens, New York City was permitted on May 19, 2026 with a stated construction value of under $1M. The work is an interior remodel and reset of fixtures and departmental spaces. Relocated BOPIC, Optical and Member Services Desk and Lock Up at the front end of the store. New service Deli, Produce Cooler, Bakery Freezer and Ref. cases at rear of store. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 66-26 Metropolitan Avenue, Queens, New York City |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 19, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “The work is an interior remodel and reset of fixtures and departmental spaces. Relocated BOPIC, Optical and Member Services Desk and Lock Up at the front end of the store. New service Deli, Produce Cooler, Bakery Freezer and Ref. cases at rear of store”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 202620 other permits at this address
- March 23, 2026Alteration: fire protection · under $1M
- March 24, 2026Alteration: fire protection · $1M to $5M
- April 9, 2026Alteration: fire protection · under $1M
- May 19, 2026Alteration: Retail Building Renovation · under $1M (this page)
- September 2, 2026Interior alteration · under $1M
- September 11, 2026Alteration: fire protection · under $1M
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
The company behind this project has 3 other projects in Builtie
- ████████ ConstructionNew York City · Alteration: mechanical · under $1M · 2026
- ████████ ConstructionNew York City · Alteration: demolition · under $1M · 2026
- ████████ ConstructionNew York · Mechanical · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jun 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1686 Davidson Avenue, Bronx: 8-Storey Apartment Building
- 211 Nostrand Avenue, Brooklyn: Mixed-Use Building
- 216 Grand Street, Brooklyn: 3-Storey Mixed-Use Building Renovation
- 372 Clinton Avenue, Brooklyn: School Renovation
- 584 Driggs Avenue, Brooklyn: School Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 66-26 Metropolitan Avenue, Queens?
Retail Building Renovation. The work is an interior remodel and reset of fixtures and departmental spaces. Relocated BOPIC, Optical and Member Services Desk and Lock Up at the front end of the store. New service Deli, Produce Cooler, Bakery Freezer and Ref. cases at rear of store
When was the permit issued for 66-26 Metropolitan Avenue, Queens?
May 19, 2026, by New York City.
Who is building 66-26 Metropolitan Avenue, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 66-26 Metropolitan Avenue, Queens need now?