620 8 Avenue, Manhattan, New York City: Restaurant Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Restaurant Renovation at 620 8 Avenue, Manhattan, New York City was permitted on July 29, 2026 with a stated construction value of under $1M. Starbuck's--general construction inclusive of mobifications to interior partitions for cafe renovation. no change to use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address620 8 Avenue, Manhattan, New York City
ProjectRestaurant Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedJuly 29, 2026
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitPiece Management Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Starbuck's--general construction inclusive of mobifications to interior partitions for cafe renovation. no change to use, egress, or occupancy”

Where this project is

  1. Since May 20263 other permits at this address
  2. May 15, 2026Alteration: mechanical · under $1M
  3. May 26, 2026Alteration: structural work · under $1M
  4. June 24, 2026Alteration: fire protection · under $1M
  5. July 29, 2026Alteration: Restaurant Renovation · under $1M (this page)
  6. July 29, 2026Alteration: plumbing · under $1M
  7. October 13, 2026Alteration: mechanical · under $1M
  8. May 2026Estimated construction start (estimate)
  9. December 2026Estimated completion (estimate)

How we estimate: from the same company's first permit at this address (May 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

149 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Dec 2026Estimate
Excavation and Site WorkMay 2026Window passed (est.)
Construction Site SecurityMay 2026 – Jun 2026Window passed (est.)
Concrete and FoundationMay 2026 – Jun 2026Window passed (est.)
Structural SteelMay 2026 – Jun 2026Window passed (est.)
ElevatorsMay 2026 – Jul 2026Window passed (est.)
FramingMay 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryMay 2026 – Jun 2026Window passed (est.)
WaterproofingMay 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 620 8 Avenue, Manhattan?

Restaurant Renovation. Starbuck's--general construction inclusive of mobifications to interior partitions for cafe renovation. no change to use, egress, or occupancy

When was the permit issued for 620 8 Avenue, Manhattan?

July 29, 2026, by New York City.

Who is building 620 8 Avenue, Manhattan?

Piece Management Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 620 8 Avenue, Manhattan need now?

Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.