63-33 108 Street, Queens, New York City: Utility Facility Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Utility Facility Renovation at 63-33 108 Street, Queens, New York City was permitted on October 13, 2026 with a stated construction value of under $1M. Interior renovation to build commercial laundry. work includes new installation of washing machines, dryers, water heater and sprinklers. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address63-33 108 Street, Queens, New York City
ProjectUtility Facility Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedOctober 13, 2026
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitGoldberg Group See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior renovation to build commercial laundry. work includes new installation of washing machines, dryers, water heater and sprinklers”

Where this project is

  1. October 13, 2026Interior alteration · under $1M
  2. October 13, 2026Alteration: Utility Facility Renovation · under $1M (this page)
  3. October 2026Estimated construction start (estimate)
  4. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more renovations within 1 km

4 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – May 2027Estimate
Excavation and Site WorkOct 2026Approach now
Construction Site SecurityOct 2026 – Nov 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelOct 2026 – Nov 2026Approach now
ElevatorsOct 2026 – Dec 2026Approach now
FramingOct 2026 – Dec 2026Approach now
PaintingNov 2026 – Jan 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 63-33 108 Street, Queens?

Utility Facility Renovation. Interior renovation to build commercial laundry. work includes new installation of washing machines, dryers, water heater and sprinklers

When was the permit issued for 63-33 108 Street, Queens?

October 13, 2026, by New York City.

Who is building 63-33 108 Street, Queens?

Goldberg Group is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 63-33 108 Street, Queens need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing. Coming up: painting from November 2026.