637 Rockaway Parkway, Brooklyn, New York City: 2-Storey Office-to-Residential Conversion

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

2-Storey Office-to-Residential Conversion at 637 Rockaway Parkway, Brooklyn, New York City was permitted on March 29, 2026 with a stated construction value of under $1M. Proposed interior renovation converting existing 2 story and basement into a 10 unit residential building. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address637 Rockaway Parkway, Brooklyn, New York City
Project2-Storey Office-to-Residential Conversion
Building typeResidential
WorkRenovation or alteration
Permit issuedMarch 29, 2026
Stated construction valueunder $1M
Estimated stageStructural work
Company named on the permitRubi Management LLC See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior renovation converting existing 2 story and basement into a 10 unit residential building”

Where this project is

  1. March 29, 2026Alteration CO: 2-Storey Office-to-Residential Conversion · under $1M (this page)
  2. April 30, 2026Alteration CO: mechanical · under $1M
  3. May 3, 2026Alteration CO: plumbing · under $1M
  4. May 27, 2026Alteration CO: fire protection · under $1M
  5. September 4, 2026Alteration CO: site protection · under $1M
  6. April 2026Estimated construction start (estimate)
  7. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

17 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie estimates the stage from this building's own permits: site work (cranes, hoists, scaffolds, sidewalk sheds or demolition) permitted since September 2026. The project is in structural work, including any added floors.

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Oct 2026Estimate
Construction Site SecurityMar 2026 – May 2026Window passed (est.)
PaintingApr 2026 – Jun 2026Window passed (est.)
MasonryApr 2026 – May 2026Window passed (est.)
WaterproofingApr 2026 – May 2026Window passed (est.)
RoofingMay 2026 – Jun 2026Window passed (est.)
Windows, Doors and GlazingApr 2026 – Jun 2026Window passed (est.)
ElectricalMay 2026 – Jun 2026Window passed (est.)
HVAC and MechanicalMay 2026 – Jun 2026Window passed (est.)
PlumbingMay 2026 – Jun 2026Window passed (est.)
Fire ProtectionMay 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 637 Rockaway Parkway, Brooklyn?

2-Storey Office-to-Residential Conversion. Proposed interior renovation converting existing 2 story and basement into a 10 unit residential building

When was the permit issued for 637 Rockaway Parkway, Brooklyn?

March 29, 2026, by New York City.

Who is building 637 Rockaway Parkway, Brooklyn?

Rubi Management LLC is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 637 Rockaway Parkway, Brooklyn need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.