7 Times Square, Manhattan, New York City: Restaurant Renovation

Restaurant Renovation at 7 Times Square, Manhattan, New York City was permitted on April 14, 2026 with a stated construction value of under $1M. Alteration-co application filed to establish new place of assembly space (cafetria) on the 30th floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 7 Times Square, Manhattan, New York City |
| Project | Restaurant Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 14, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Alteration-co application filed to establish new place of assembly space (cafetria) on the 30th floor”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 202614 other permits at this address
- April 14, 2026Alteration CO: Restaurant Renovation · under $1M (this page)
- May 19, 2026Interior alteration · $1M to $5M
- May 27, 2026Alteration: addition · $1M to $5M
- August 27, 2026Alteration: mechanical · $1M to $5M
- August 27, 2026Interior alteration · $5M to $10M
- September 1, 2026Interior alteration · under $1M
- May 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more conversions within 1 km
- 375 Madison Avenue, ManhattanAlteration: facade work · $100M to $250M · July 2026
- 592 7 Avenue, ManhattanAlteration CO: conversion to residential · $100M to $250M · July 2026
- 10 Rockefeller Plaza, ManhattanAlteration CO · $50M to $100M · July 2026
- 371 Seventh Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · October 2026
- 6 East 43 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · September 2026
157 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has 116 other projects in Builtie
- ████████ ConstructionNew York City · Alteration CO · $50M to $100M · 2026
- ████████ ConstructionNew York City · Interior alteration · $10M to $25M · 2026
- ████████ ConstructionNew York City · Alteration CO: structural work · $10M to $25M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Nov 2026 | Estimate |
| Construction Site Security | Apr 2026 – Jun 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 | Window passed (est.) |
| Structural Steel | May 2026 – Jun 2026 | Window passed (est.) |
| Elevators | May 2026 – Jun 2026 | Window passed (est.) |
| Framing | May 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | May 2026 – Jun 2026 | Window passed (est.) |
| Waterproofing | May 2026 – Jun 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 386 Park Avenue South, Manhattan: Office and Tenant Fit-Out
- 107-15 Jamaica Avenue, Queens: Office and Tenant Fit-Out
- 60 Broadway, Manhattan: Apartment Building Renovation
- 25 Navy Street, Brooklyn: Retail Building Renovation
- 481 De Kalb Avenue, Brooklyn: 8-Storey Apartment Building
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 7 Times Square, Manhattan?
Restaurant Renovation. Alteration-co application filed to establish new place of assembly space (cafetria) on the 30th floor
When was the permit issued for 7 Times Square, Manhattan?
April 14, 2026, by New York City.
Who is building 7 Times Square, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 7 Times Square, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.