700 Nolan Hill Ri NW, Calgary: Apartment Building

Apartment Building at 700 Nolan Hill Ri NW, Calgary was permitted on December 14, 2025 with a stated construction value of $25M to $50M. Nolan Hill Phase 3 Residential Tower B. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 700 Nolan Hill Ri NW, Calgary |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | December 14, 2025 |
| Stated construction value | $25M to $50M |
| Estimated stage | Foundation |
| Company named on the permit | Cidex Development |
| Decision makers and contacts | In Builtie |
From the permit: “Nolan Hill Phase 3 Residential Tower B”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 5201 110 Av SE: Warehouse
- 1851 80 St SW: 6-Storey Townhomes
- 3 Haddon Rd SW: 6-Storey Apartment Building
- 2623 56 St NE: Office and Tenant Fit-Out
- 9400 Blackfoot Tr SE: Apartment Building
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 700 Nolan Hill Ri NW?
Apartment Building. Nolan Hill Phase 3 Residential Tower B
When was the permit issued for 700 Nolan Hill Ri NW?
December 14, 2025, by the City of Calgary.
Who is building 700 Nolan Hill Ri NW?
Cidex Development is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 700 Nolan Hill Ri NW need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
