719 Alma Real Dr, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 719 Alma Real Dr, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on March 10, 2026 with a stated construction value of $250K to $500K, and the rebuild is with the mechanical, electrical and interior trades at work (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 719 Alma Real Dr, Pacific Palisades, Los Angeles, CA |
| City permit address | 719 N Alma Real Dr |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, basement, attached garage, fire sprinklers throughout |
| Rebuild track | Not like-for-like, so it went through the City's standard plan review |
| Building permit issued | March 10, 2026 |
| Status | With the mechanical, electrical and interior trades at work (Builtie's estimate) |
| Stated construction value | $250K to $500K |
| Builder named on the permits | Arbib & Sons Construction Inc |
| Permits at this address since the fire | 4 |
The facts above are read from the City of Los Angeles building permits filed for 719 Alma Real Dr since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| March 10, 2026 | New single-family home | Issued |
| March 10, 2026 | Grading | Issued |
| May 1, 2026 | Repair or alteration: revision to an earlier permit | Issued |
| September 18, 2026 | Repair or alteration | Issued |
4 permits since March 10, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
719 Alma Real Dr is with the mechanical, electrical and interior trades at work (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
Other rebuilds on Alma Real Dr
- 671 Alma Real Dr: New single-family home, framing
- 673 Alma Real Dr: New accessory dwelling unit (ADU), finishing
- 707 Alma Real Dr: New single-family home, framing
- 710 Alma Real Dr: New single-family home, framing
- 715 Alma Real Dr: New single-family home, interior trades
- 739 Alma Real Dr: New single-family home, framing
- 745 Alma Real Dr: New single-family home, framing
- 765 Alma Real Dr: New single-family home, foundation
All of them: fire rebuilds on Alma Real Dr. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 719 Alma Real Dr, Pacific Palisades?
New single-family home (2 storeys, basement, attached garage, fire sprinklers throughout), permitted March 10, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 719 Alma Real Dr?
It is with the mechanical, electrical and interior trades at work (Builtie's estimate), read October 20, 2026.
Is 719 Alma Real Dr a like-for-like rebuild?
No. The City marked its permit ineligible for the like-for-like track, so the plans went through standard review.
Who is building 719 Alma Real Dr?
Arbib & Sons Construction Inc is named on the permits. The decision makers and contacts are in Builtie.