744 Park Place, Brooklyn, New York City: 4-Storey Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

4-Storey Apartment Building Renovation at 744 Park Place, Brooklyn, New York City was filed with New York City on October 2, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). New stair bulkhead to roof on an existing 8 family, 4 story dwelling. Convert existing Cellar to accessory use in conjunction with 1st floor apartments. Accessory storage rooms. Change of egress from Cellar. Paa to add a new penthouse. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 744 Park Place, Brooklyn, New York City |
| Project | 4-Storey Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Filed with the city | October 2, 2026 |
| City status | Not yet approved (DOB status: Plan Examiner Review) |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “New stair bulkhead to roof on an existing 8 family, 4 story dwelling. Convert existing Cellar to accessory use in conjunction with 1st floor apartments. Accessory storage rooms. Change of egress from Cellar. Paa to add a new penthouse”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- October 2, 2026Alteration CO: 4-Storey Apartment Building Renovation · under $1M (this page)
- October 2026Estimated construction start (estimate)
- May 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 900 St Marks Avenue, BrooklynAlteration: roofing · $10M to $25M · April 2026
- 705 Franklin Avenue, BrooklynNew building · $10M to $25M · June 2026
- 275 Crown Street, BrooklynAlteration: site protection · $10M to $25M · August 2026
- 330 Crown Street, BrooklynAlteration: facade work · $10M to $25M · June 2026
- 1150 Carroll Street, BrooklynAlteration · $5M to $10M · March 2026
19 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2026 – May 2027 | Estimate |
| Excavation and Site Work | Sep 2026 – Oct 2026 | Approach now |
| Construction Site Security | Sep 2026 – Nov 2026 | Approach now |
| Concrete and Foundation | Oct 2026 | Approach now |
| Structural Steel | Oct 2026 – Nov 2026 | Approach now |
| Elevators | Oct 2026 – Nov 2026 | Approach now |
| Framing | Oct 2026 – Nov 2026 | Approach now |
| Painting | Oct 2026 – Dec 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Excavation and Site Work leads in New York City · Construction Site Security leads in New York City · Concrete and Foundation leads in New York City · Structural Steel leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 258 East 23 Street, Brooklyn: Two-Family House Renovation
- 37-44 74 Street, Queens: Office and Tenant Fit-Out
- 91-15 Hollis Court Boulevard, Queens: Single-Family House Renovation
- 1963 Madison Avenue, Manhattan: Apartment Building Renovation
- 115a 2 Place, Brooklyn: Single-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 744 Park Place, Brooklyn?
4-Storey Apartment Building Renovation. New stair bulkhead to roof on an existing 8 family, 4 story dwelling. Convert existing Cellar to accessory use in conjunction with 1st floor apartments. Accessory storage rooms. Change of egress from Cellar. Paa to add a new penthouse
Has 744 Park Place, Brooklyn been permitted?
Not yet. The work was filed with New York City on October 2, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).
Who is building 744 Park Place, Brooklyn?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 744 Park Place, Brooklyn need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing; painting.