7920-7922 N Radford Ave, Los Angeles: 2-Storey Accessory Dwelling Unit
Follow this project · we email you when its status or build stage changes

2-Storey Accessory Dwelling Unit at 7920-7922 N Radford Ave, Los Angeles was permitted on October 6, 2026 with a stated construction value of under $1M. New accessory dwelling unit, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 7920-7922 N Radford Ave, Los Angeles |
| Project | 2-Storey Accessory Dwelling Unit |
| Building type | Residential |
| Work | New building |
| Storeys | 2 |
| Permit issued | October 6, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Los Angeles once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- October 6, 2026New home: 2-Storey Accessory Dwelling Unit ยท under $1M (this page)
- November 2026Estimated construction start (estimate)
- May 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 4 coming up.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Nov 2026 – May 2027 | Estimate |
| Excavation and Site Work | Oct 2026 – Nov 2026 | Approach now |
| Construction Site Security | Oct 2026 – Dec 2026 | Approach now |
| Concrete and Foundation | Oct 2026 – Nov 2026 | Approach now |
| Structural Steel | Nov 2026 – Dec 2026 | Coming up |
| Elevators | Nov 2026 – Dec 2026 | Coming up |
| Framing | Nov 2026 – Dec 2026 | Coming up |
| Painting | Nov 2026 – Jan 2027 | Coming up |
How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Los Angeles
Leads for your trade: Excavation and Site Work leads in Los Angeles · Construction Site Security leads in Los Angeles · Concrete and Foundation leads in Los Angeles · Structural Steel leads in Los Angeles · every trade in Los Angeles.
More projects: every Los Angeles project of $1M+ by address · major projects in Los Angeles.
Compare tools: The Best Construction Lead Generation Software in California.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 25121 S Belle Porte Ave: Accessory Dwelling Unit
- 5102 N Gaviota Ave: Accessory Dwelling Unit
- 13223 W Rose Ave: Single-Family House Renovation
- 17605 W Castellammare Dr: House Renovation
- 411 N Bowling Green Way: 2-Storey Single-Family House
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 7920-7922 N Radford Ave?
2-Storey Accessory Dwelling Unit. New accessory dwelling unit, 2 storeys.
When was the permit issued for 7920-7922 N Radford Ave?
October 6, 2026, by the City of Los Angeles.
Who is building 7920-7922 N Radford Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 7920-7922 N Radford Ave need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete. Coming up: structural steel from November 2026, elevator from November 2026, framing from November 2026 and painting from November 2026.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
