845 East 136 Street, Bronx, New York City: Warehouse Renovation

Warehouse Renovation at 845 East 136 Street, Bronx, New York City was permitted on June 8, 2026 with a stated construction value of under $1M. FILING HEREWITH ALT 2 APPLICATION FOR INTERIOR STRUCTURAL ALTERATIONS TO A EXISTING MASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTING MEZZANINE LEVEL. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 845 East 136 Street, Bronx, New York City |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | June 8, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “FILING HEREWITH ALT 2 APPLICATION FOR INTERIOR STRUCTURAL ALTERATIONS TO A EXISTING MASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTING MEZZANINE LEVEL”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since June 20261 other permit at this address
- June 4, 2026Interior alteration · under $1M
- June 8, 2026Alteration: plumbing · under $1M
- June 8, 2026Alteration: Warehouse Renovation · under $1M (this page)
- June 8, 2026Alteration · under $1M
- June 9, 2026Alteration: roofing · under $1M
- September 17, 2026Alteration · under $1M
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 470 Jackson Avenue, BronxAlteration: roofing · $10M to $25M · June 2026
- 410 Jackson Avenue, BronxAlteration CO: structural work · $1M to $5M · September 2026
- 673 East 137 Street, BronxAlteration · $1M to $5M · February 2026
- 593 East 132 Street, BronxAlteration: electrical · $1M to $5M · September 2026
- 345 Cypress Avenue, BronxAlteration · $1M to $5M · May 2026
9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 661 8 Avenue, Manhattan: Restaurant Renovation
- 1380 Clay Avenue, Bronx: Apartment Building Renovation
- 406 East 153 Street, Bronx: 4-Storey Apartment Building
- 156 5 Avenue, Manhattan: Office and Tenant Fit-Out
- 639 Rockaway Parkway, Brooklyn: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 845 East 136 Street, Bronx?
Warehouse Renovation. FILING HEREWITH ALT 2 APPLICATION FOR INTERIOR STRUCTURAL ALTERATIONS TO A EXISTING MASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTING MEZZANINE LEVEL
When was the permit issued for 845 East 136 Street, Bronx?
June 8, 2026, by New York City.
Who is building 845 East 136 Street, Bronx?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 845 East 136 Street, Bronx need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.