661 8 Avenue, Manhattan, New York City: Restaurant Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Restaurant Renovation at 661 8 Avenue, Manhattan, New York City was permitted on September 23, 2026 with a stated construction value of under $1M. Herewith file to renovate restaurant. work includes new non-load bearing wall, new plumbing fixtures, new floor covering, and general construction. no change in use, egress, and occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address661 8 Avenue, Manhattan, New York City
ProjectRestaurant Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 23, 2026
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Herewith file to renovate restaurant. work includes new non-load bearing wall, new plumbing fixtures, new floor covering, and general construction. no change in use, egress, and occupancy”

Where this project is

  1. Since April 20266 other permits at this address
  2. April 28, 2026Alteration CO: plumbing · under $1M
  3. August 26, 2026Alteration CO: fire protection · under $1M
  4. September 9, 2026Alteration: structural work · under $1M
  5. September 23, 2026Alteration CO: Restaurant Renovation · under $1M (this page)
  6. September 29, 2026Alteration CO: plumbing · under $1M
  7. October 13, 2026Alteration CO: mechanical · under $1M
  8. October 2026Estimated construction start (estimate)
  9. April 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more conversions within 1 km

127 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 7 other projects in Builtie

  • New York City · Alteration CO: conversion to residential · under $1M · 2026
  • New York City · Alteration: fire protection · under $1M · 2026
  • New York City · Alteration: roofing · under $1M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – Apr 2027Estimate
Excavation and Site WorkOct 2026Approach now
Construction Site SecurityOct 2026 – Nov 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelOct 2026 – Nov 2026Approach now
ElevatorsOct 2026 – Nov 2026Approach now
FramingOct 2026 – Nov 2026Approach now
PaintingNov 2026 – Dec 2026Coming up

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 661 8 Avenue, Manhattan?

Restaurant Renovation. Herewith file to renovate restaurant. work includes new non-load bearing wall, new plumbing fixtures, new floor covering, and general construction. no change in use, egress, and occupancy

When was the permit issued for 661 8 Avenue, Manhattan?

September 23, 2026, by New York City.

Who is building 661 8 Avenue, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 661 8 Avenue, Manhattan need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing. Coming up: painting from November 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.