85-52 85 Street, Queens, New York City: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 85-52 85 Street, Queens, New York City was filed with New York City on October 14, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Replacement of existing wall pads, gym floor finish, basketball backboards, drinking fountain with new equipment. replace furniture in the coach office. upgrade existing playroom space to a functional gym. patching and new paint finish. replace all lights. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address85-52 85 Street, Queens, New York City
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Filed with the cityOctober 14, 2026
City statusNot yet approved (DOB status: Plan Examiner Review)
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitNyc School Construction See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Replacement of existing wall pads, gym floor finish, basketball backboards, drinking fountain with new equipment. replace furniture in the coach office. upgrade existing playroom space to a functional gym. patching and new paint finish. replace all lights”

Where this project is

  1. July 21, 2026Alteration · under $1M
  2. August 7, 2026Alteration · under $1M
  3. October 14, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
  4. October 16, 2026Alteration · under $1M
  5. August 2026Estimated construction start (estimate)
  6. March 2027Estimated completion (estimate)

How we estimate: from the same company's first permit at this address (August 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Nyc School Construction has 56 other projects in Builtie

  • New York City · Alteration: mechanical · $10M to $25M · 2026
  • New York City · Alteration: roofing · $5M to $10M · 2026
  • New York City · Alteration: foundation · $5M to $10M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 6 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Mar 2027Estimate
Excavation and Site WorkAug 2026Window passed (est.)
Construction Site SecurityAug 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Sep 2026Window passed (est.)
FramingAug 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 85-52 85 Street, Queens?

Office and Tenant Fit-Out. Replacement of existing wall pads, gym floor finish, basketball backboards, drinking fountain with new equipment. replace furniture in the coach office. upgrade existing playroom space to a functional gym. patching and new paint finish. replace all lights

Has 85-52 85 Street, Queens been permitted?

Not yet. The work was filed with New York City on October 14, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).

Who is building 85-52 85 Street, Queens?

Nyc School Construction is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 85-52 85 Street, Queens need now?

Estimated as of October 2026, the trades to approach now are painting. Already passed: excavation and site work; site security; concrete; structural steel; elevator; framing.