92-10 Atlantic Avenue, Queens, New York City: Utility Facility Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Utility Facility Renovation at 92-10 Atlantic Avenue, Queens, New York City was permitted on April 22, 2026 with a stated construction value of under $1M. Establishment of commercial laundromat. no change in use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address92-10 Atlantic Avenue, Queens, New York City
ProjectUtility Facility Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedApril 22, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitMorell Builders Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Establishment of commercial laundromat. no change in use, egress, or occupancy”

Where this project is

  1. April 8, 2026Interior alteration · under $1M
  2. April 22, 2026Alteration: Utility Facility Renovation · under $1M (this page)
  3. April 2026Estimated construction start (estimate)
  4. November 2026Estimated completion (estimate)

How we estimate: from the same company's first permit at this address (April 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Morell Builders Inc. has 94 other projects in Builtie

  • New York City · Alteration CO · under $1M · 2026
  • New York City · Alteration CO: conversion to residential · under $1M · 2026
  • New York City · Alteration CO: conversion to residential · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Nov 2026Estimate
Construction Site SecurityApr 2026 – May 2026Window passed (est.)
PaintingMay 2026 – Jul 2026Window passed (est.)
MasonryApr 2026 – May 2026Window passed (est.)
WaterproofingApr 2026 – May 2026Window passed (est.)
RoofingMay 2026 – Jun 2026Window passed (est.)
Windows, Doors and GlazingMay 2026 – Jun 2026Window passed (est.)
ElectricalMay 2026 – Jul 2026Window passed (est.)
HVAC and MechanicalMay 2026 – Jul 2026Window passed (est.)
PlumbingMay 2026 – Jul 2026Window passed (est.)
Fire ProtectionMay 2026 – Jul 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 92-10 Atlantic Avenue, Queens?

Utility Facility Renovation. Establishment of commercial laundromat. no change in use, egress, or occupancy

When was the permit issued for 92-10 Atlantic Avenue, Queens?

April 22, 2026, by New York City.

Who is building 92-10 Atlantic Avenue, Queens?

Morell Builders Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 92-10 Atlantic Avenue, Queens need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.