97 Lenevar Avenue, Staten Island, New York City: Duplex Renovation
Follow this project · we email you when its status or build stage changes

Duplex Renovation at 97 Lenevar Avenue, Staten Island, New York City was filed with New York City on August 27, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Renovation or addition to a duplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 97 Lenevar Avenue, Staten Island, New York City |
| Project | Duplex Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Filed with the city | August 27, 2026 |
| City status | Not yet approved (DOB status: Plan Examiner Review) |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 30, 2026Alteration: site protection · under $1M
- August 27, 2026Alteration: Duplex Renovation · under $1M (this page)
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now, 2 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 – Sep 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Construction Site Security leads in New York City · Structural Steel leads in New York City · Elevators leads in New York City · Framing leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 197 Malcolm X Boulevard, Brooklyn: Apartment Building Renovation
- 1674 Broadway, Manhattan: Office and Tenant Fit-Out
- 31 80 Street, Brooklyn: Single-Family House Renovation
- 178 Beaumont Street, Brooklyn: Single-Family House Renovation
- 760 Madison Avenue, Manhattan: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 97 Lenevar Avenue, Staten Island?
Duplex Renovation. Renovation or addition to a duplex.
Has 97 Lenevar Avenue, Staten Island been permitted?
Not yet. The work was filed with New York City on August 27, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).
Who is building 97 Lenevar Avenue, Staten Island?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 97 Lenevar Avenue, Staten Island need now?
Estimated as of October 2026, the trades to approach now are site security, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work; concrete.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.