995 Myrtle Avenue, Brooklyn, New York City: Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

Apartment Building Renovation at 995 Myrtle Avenue, Brooklyn, New York City was filed with New York City on July 9, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). NYCHA Sumner Building 8 Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 995 Myrtle Avenue, Brooklyn, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Filed with the city | July 9, 2026 |
| City status | Not yet approved (DOB status: Plan Examiner Review) |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “NYCHA Sumner Building 8 Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- March 24, 2026Alteration · under $1M · filed as 68 Marcus Garvey Boulevard, Brooklyn
- July 7, 2026Alteration: facade work · filed as 68 Marcus Garvey Boulevard, Brooklyn
- July 9, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- July 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 760 Broadway, BrooklynAlteration · $10M to $25M · September 2026
- 93 Lewis Avenue, BrooklynAlteration: facade work · $10M to $25M · April 2026
- 125 Stuyvesant Avenue, BrooklynAlteration: facade work · $5M to $10M · March 2026
- 10 Lewis Avenue, BrooklynAlteration: mechanical · $5M to $10M · October 2026
- 11 Gerry Street, BrooklynNew building · $5M to $10M · August 2026
16 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 9 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Feb 2027 | Estimate |
| Construction Site Security | Jul 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Sep 2026 | Window passed (est.) |
| Framing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Painting leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 36-22 31 Street, Queens: Mixed-Use Building
- 123 Manhattan Avenue, Manhattan: Single-Family House Renovation
- 1149 St Marks Avenue, Brooklyn: Two-Family House Renovation
- 395 Clermont Avenue, Brooklyn: Two-Family House Renovation
- 297 Macon Street, Brooklyn: Two-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 995 Myrtle Avenue, Brooklyn?
Apartment Building Renovation. NYCHA Sumner Building 8 Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters
Has 995 Myrtle Avenue, Brooklyn been permitted?
Not yet. The work was filed with New York City on July 9, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).
Who is building 995 Myrtle Avenue, Brooklyn?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 995 Myrtle Avenue, Brooklyn need now?
Estimated as of October 2026, the trades to approach now are painting. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; roofing; window, door and glazing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.