1 W WORLD WAY Basement, Los Angeles: Office and Tenant Fit-Out
Follow this project · we email you when its status or build stage changes

Office and Tenant Fit-Out at 1 W WORLD WAY Basement, Los Angeles was permitted on September 25, 2026 with a stated construction value of under $1M. **ePlan**LAX**RENOVATION TO EXISTING TENANT IMPROVEMENT OFFICE, PARTIAL SPACE OF BASEMENT LEVEL, EXISTING BUSINESS OCCUPANCY. 397 SQ FT CONVERTED TO STORAGE, 331 SQ FT CONVERTED TO LOCKER ROOMS, NEW SPACES NEW NON-LOAD BEARING PARTITION WALLS, RENOVATED TO… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1 W WORLD WAY Basement, Los Angeles |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 25, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Hensel Phelps Construction Co See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “**ePlan**LAX**RENOVATION TO EXISTING TENANT IMPROVEMENT OFFICE, PARTIAL SPACE OF BASEMENT LEVEL, EXISTING BUSINESS OCCUPANCY. 397 SQ FT CONVERTED TO STORAGE, 331 SQ FT CONVERTED TO LOCKER ROOMS, NEW SPACES NEW NON-LOAD BEARING PARTITION WALLS, RENOVATED TO…”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Los Angeles once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 25, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- October 2026Estimated construction start (estimate)
- April 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 5 more renovations within 1 km
- 500 World WayAddition · over $250M · August 2026
- 100-800 World WayAlteration · $100M to $250M · June 2026
- 400 W World WayAlteration: structural work · $25M to $50M · November 2025
- 380 World WayAlteration · $25M to $50M · March 2026
- 200 World Way T212b010Alteration · $10M to $25M · January 2026
21 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Hensel Phelps Construction Co has 12 other projects in Builtie
- Los Angeles · New construction: addition · over $250M · 2026
- Los Angeles · Alteration · $100M to $250M · 2026
- Los Angeles · Alteration: structural work · $25M to $50M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2026 – Apr 2027 | Estimate |
| Excavation and Site Work | Sep 2026 – Oct 2026 | Approach now |
| Construction Site Security | Sep 2026 – Nov 2026 | Approach now |
| Concrete and Foundation | Sep 2026 – Oct 2026 | Approach now |
| Structural Steel | Oct 2026 – Nov 2026 | Approach now |
| Elevators | Oct 2026 – Nov 2026 | Approach now |
| Framing | Oct 2026 – Nov 2026 | Approach now |
| Painting | Oct 2026 – Dec 2026 | Approach now |
| Masonry | Oct 2026 – Nov 2026 | Approach now |
| Waterproofing | Oct 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Los Angeles
Leads for your trade: Excavation and Site Work leads in Los Angeles · Construction Site Security leads in Los Angeles · Concrete and Foundation leads in Los Angeles · Structural Steel leads in Los Angeles · every trade in Los Angeles.
More projects: every Los Angeles project of $1M+ by address · major projects in Los Angeles.
Compare tools: The Best Construction Lead Generation Software in California.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 1701 E Cesar E Chavez Ave: Utility Facility Renovation
- 4337-4339 N Reyes Dr: 2-Storey Single-Family House
- 2857 N Glendale Blvd: 4-Storey Accessory Dwelling Unit
- 19454 W Wells Dr: Single-Family House Renovation
- 4854 N Nomad Dr: Single-Family House Renovation
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1 W WORLD WAY Basement?
Office and Tenant Fit-Out. **ePlan**LAX**RENOVATION TO EXISTING TENANT IMPROVEMENT OFFICE, PARTIAL SPACE OF BASEMENT LEVEL, EXISTING BUSINESS OCCUPANCY. 397 SQ FT CONVERTED TO STORAGE, 331 SQ FT CONVERTED TO LOCKER ROOMS, NEW SPACES NEW NON-LOAD BEARING PARTITION WALLS, RENOVATED TO…
When was the permit issued for 1 W WORLD WAY Basement?
September 25, 2026, by the City of Los Angeles.
Who is building 1 W WORLD WAY Basement?
Hensel Phelps Construction Co is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1 W WORLD WAY Basement need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
