110 East 42 Street, Manhattan, New York City: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 110 East 42 Street, Manhattan, New York City was permitted on October 5, 2026 with a stated construction value of under $1M. Herewith Filing Modification to existing Mechanical system in conjunction with interior renovations of offices. No change in Use, Egress or Occupancy is proposed under this application. (Construction floors 7 and 8/ Marketing Floors 11 and 12 ). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address110 East 42 Street, Manhattan, New York City
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedOctober 5, 2026
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Herewith Filing Modification to existing Mechanical system in conjunction with interior renovations of offices. No change in Use, Egress or Occupancy is proposed under this application. (Construction floors 7 and 8/ Marketing Floors 11 and 12 )”

Where this project is

  1. Since March 20264 other permits at this address
  2. March 24, 2026Alteration: fire protection · under $1M
  3. June 11, 2026Alteration · under $1M
  4. June 15, 2026Alteration: fire protection · under $1M
  5. June 15, 2026Alteration: mechanical · under $1M
  6. October 5, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
  7. October 5, 2026Alteration: fire protection · under $1M
  8. November 2026Estimated construction start (estimate)
  9. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 375 Madison Avenue, ManhattanAlteration: facade work · $100M to $250M · July 2026
  • 592 7 Avenue, ManhattanAlteration CO: conversion to residential · $100M to $250M · July 2026
  • 325 Park Avenue, ManhattanAlteration: structural work · $100M to $250M · March 2026
  • 229 East 42 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · July 2026
  • 10 Rockefeller Plaza, ManhattanAlteration CO · $50M to $100M · July 2026

174 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 4 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Nov 2026 – May 2027Estimate
Excavation and Site WorkOct 2026 – Nov 2026Approach now
Construction Site SecurityOct 2026 – Dec 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelNov 2026 – Dec 2026Coming up
ElevatorsNov 2026 – Dec 2026Coming up
FramingNov 2026 – Dec 2026Coming up
PaintingNov 2026 – Jan 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 110 East 42 Street, Manhattan?

Office and Tenant Fit-Out. Herewith Filing Modification to existing Mechanical system in conjunction with interior renovations of offices. No change in Use, Egress or Occupancy is proposed under this application. (Construction floors 7 and 8/ Marketing Floors 11 and 12 )

When was the permit issued for 110 East 42 Street, Manhattan?

October 5, 2026, by New York City.

Who is building 110 East 42 Street, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 110 East 42 Street, Manhattan need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete. Coming up: structural steel from November 2026, elevator from November 2026, framing from November 2026 and painting from November 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.