132-40 Metropolitan Avenue, Queens, New York City: Commercial Project Renovation
Follow this project · we email you when its status or build stage changes

Commercial Project Renovation at 132-40 Metropolitan Avenue, Queens, New York City was filed with New York City on October 16, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Prof Cert QA Review). Interior renovation to build commercial laundry. work includes installation of minor partitions and door, concrete pad for washer, replace floor & ceiling finish, dryer exhaust vent with f.a.i. and air condition/heating system. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 132-40 Metropolitan Avenue, Queens, New York City |
| Project | Commercial Project Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Filed with the city | October 16, 2026 |
| City status | Not yet approved (DOB status: Prof Cert QA Review) |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior renovation to build commercial laundry. work includes installation of minor partitions and door, concrete pad for washer, replace floor & ceiling finish, dryer exhaust vent with f.a.i. and air condition/heating system”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since May 20261 other permit at this address
- May 4, 2026Alteration: fire protection · under $1M
- May 4, 2026Interior alteration · under $1M
- July 28, 2026Alteration: fire protection · under $1M
- September 24, 2026Alteration: fire protection · under $1M
- October 14, 2026Alteration · under $1M
- October 16, 2026Alteration: Commercial Project Renovation · under $1M (this page)
- May 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (May 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 5 more renovations within 1 km
- 89-17 Sutphin Boulevard, QueensAlteration: structural work · $5M to $10M · March 2026
- 120-30 Jamaica Avenue, QueensAlteration: fire protection · $1M to $5M · July 2026
- 87-46 123 Street, QueensAlteration: roofing · $1M to $5M · June 2026
- 85-02 139 Street, QueensAlteration: facade work · $1M to $5M · October 2026
- 87-28 130 Street, QueensInterior alteration · $1M to $5M · August 2026
11 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has 2 other projects in Builtie
- ████████ ConstructionNew York City · Alteration CO: interior alteration · under $1M · 2026
- ████████ ConstructionNew York City · Alteration: site protection · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Dec 2026 | Estimate |
| Excavation and Site Work | Apr 2026 – May 2026 | Window passed (est.) |
| Construction Site Security | Apr 2026 – Jun 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 | Window passed (est.) |
| Structural Steel | May 2026 – Jun 2026 | Window passed (est.) |
| Elevators | May 2026 – Jun 2026 | Window passed (est.) |
| Framing | May 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 454a Decatur Street, Brooklyn: Single-Family House Renovation
- 345 West 42 Street, Manhattan: Apartment Building Renovation
- 315 Hancock Street, Brooklyn: Apartment Building Renovation
- 1347 73 Street, Brooklyn: Duplex Renovation
- 209 Madison Avenue, Manhattan: Place of Worship Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 132-40 Metropolitan Avenue, Queens?
Commercial Project Renovation. Interior renovation to build commercial laundry. work includes installation of minor partitions and door, concrete pad for washer, replace floor & ceiling finish, dryer exhaust vent with f.a.i. and air condition/heating system
Has 132-40 Metropolitan Avenue, Queens been permitted?
Not yet. The work was filed with New York City on October 16, 2026; the city has not approved it yet (DOB status: Prof Cert QA Review).
Who is building 132-40 Metropolitan Avenue, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 132-40 Metropolitan Avenue, Queens need now?
Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.