209 Madison Avenue, Manhattan, New York City: Place of Worship Renovation
Follow this project · we email you when its status or build stage changes

Place of Worship Renovation at 209 Madison Avenue, Manhattan, New York City was filed with New York City on September 25, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). Mechanical ac equipment installation for the replacement of an existing mechanical system on the cellar and first floors of the church of the incarnation. no change of use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 209 Madison Avenue, Manhattan, New York City |
| Project | Place of Worship Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Filed with the city | September 25, 2026 |
| City status | Not yet approved (DOB status: Objections) |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Mechanical ac equipment installation for the replacement of an existing mechanical system on the cellar and first floors of the church of the incarnation. no change of use, egress, or occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 25, 2026Alteration: Place of Worship Renovation · under $1M (this page)
- October 2026Estimated construction start (estimate)
- April 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 375 Madison Avenue, ManhattanAlteration: facade work · $100M to $250M · July 2026
- 592 7 Avenue, ManhattanAlteration CO: conversion to residential · $100M to $250M · July 2026
- 229 East 42 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · July 2026
- 371 Seventh Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · October 2026
- 6 East 43 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · September 2026
164 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2026 – Apr 2027 | Estimate |
| Excavation and Site Work | Sep 2026 – Oct 2026 | Approach now |
| Construction Site Security | Sep 2026 – Nov 2026 | Approach now |
| Concrete and Foundation | Sep 2026 – Oct 2026 | Approach now |
| Structural Steel | Oct 2026 – Nov 2026 | Approach now |
| Elevators | Oct 2026 – Nov 2026 | Approach now |
| Framing | Oct 2026 – Nov 2026 | Approach now |
| Painting | Oct 2026 – Dec 2026 | Approach now |
| Masonry | Oct 2026 – Nov 2026 | Approach now |
| Waterproofing | Oct 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Excavation and Site Work leads in New York City · Construction Site Security leads in New York City · Concrete and Foundation leads in New York City · Structural Steel leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 454a Decatur Street, Brooklyn: Single-Family House Renovation
- 345 West 42 Street, Manhattan: Apartment Building Renovation
- 315 Hancock Street, Brooklyn: Apartment Building Renovation
- 1347 73 Street, Brooklyn: Duplex Renovation
- 132-40 Metropolitan Avenue, Queens: Commercial Project Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 209 Madison Avenue, Manhattan?
Place of Worship Renovation. Mechanical ac equipment installation for the replacement of an existing mechanical system on the cellar and first floors of the church of the incarnation. no change of use, egress, or occupancy
Has 209 Madison Avenue, Manhattan been permitted?
Not yet. The work was filed with New York City on September 25, 2026; the city has not approved it yet (DOB status: Objections).
Who is building 209 Madison Avenue, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 209 Madison Avenue, Manhattan need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.