148 Grattan Street, Brooklyn, New York City: Retail Building Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Retail Building Renovation at 148 Grattan Street, Brooklyn, New York City was permitted on March 27, 2026 with a stated construction value of under $1M. Emergency alteration to remove collapsed roof, restore roof system, replace structural system per plan, and install new roofing assembly. No change in use, occupancy, or egress. Filing submitted to lift full Vacate Order and address ECB/OATH Violation. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address148 Grattan Street, Brooklyn, New York City
ProjectRetail Building Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedMarch 27, 2026
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Emergency alteration to remove collapsed roof, restore roof system, replace structural system per plan, and install new roofing assembly. No change in use, occupancy, or egress. Filing submitted to lift full Vacate Order and address ECB/OATH Violation”

Where this project is

  1. March 27, 2026Alteration: Retail Building Renovation · under $1M (this page)
  2. April 2026Estimated construction start (estimate)
  3. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

11 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Oct 2026Estimate
Fire ProtectionMay 2026 – Jun 2026Window passed (est.)
Signage and WayfindingJun 2026 – Aug 2026Window passed (est.)
InsulationMay 2026 – Jun 2026Window passed (est.)
DrywallMay 2026 – Jul 2026Window passed (est.)
Low Voltage and DataMay 2026 – Jul 2026Window passed (est.)
TileJun 2026 – Jul 2026Window passed (est.)
Cabinetry and MillworkMay 2026 – Jul 2026Window passed (est.)
FlooringJun 2026 – Jul 2026Window passed (est.)
CountertopsJun 2026 – Jul 2026Window passed (est.)
Finish CarpentryJun 2026 – Jul 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 148 Grattan Street, Brooklyn?

Retail Building Renovation. Emergency alteration to remove collapsed roof, restore roof system, replace structural system per plan, and install new roofing assembly. No change in use, occupancy, or egress. Filing submitted to lift full Vacate Order and address ECB/OATH Violation

When was the permit issued for 148 Grattan Street, Brooklyn?

March 27, 2026, by New York City.

Who is building 148 Grattan Street, Brooklyn?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 148 Grattan Street, Brooklyn need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.