158 West 27 Street, Manhattan, New York City: Retail Building Renovation
Follow this project · we email you when its status or build stage changes

Retail Building Renovation at 158 West 27 Street, Manhattan, New York City was permitted on March 18, 2026 with a stated construction value of under $1M. In existing physical culture establishment in cellar, 1st and 2nd floor. minor partition work, counter work, and plumbing work. replace store front glazing with operable window approximately 5 feet wide. no change to existing use, egress and occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 158 West 27 Street, Manhattan, New York City |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | March 18, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “In existing physical culture establishment in cellar, 1st and 2nd floor. minor partition work, counter work, and plumbing work. replace store front glazing with operable window approximately 5 feet wide. no change to existing use, egress and occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- March 18, 2026Alteration: Retail Building Renovation · under $1M (this page)
- September 28, 2026Alteration: mechanical · under $1M
- September 28, 2026Alteration · under $1M
- September 28, 2026Alteration: fire protection · under $1M
- April 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 371 Seventh Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · October 2026
- 2 Penn Plaza, ManhattanInterior alteration · $25M to $50M · July 2026
- 95 Madison Avenue, ManhattanAlteration CO: conversion to residential · $25M to $50M · September 2026
- 110 West 32 Street, ManhattanAlteration CO: plumbing · $10M to $25M · July 2026
- 11 Pennsylvania Plaza, ManhattanAlteration · $10M to $25M · October 2026
119 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has another project in Builtie, with 2 permits
- ████████ ConstructionNew York · Mechanical · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Oct 2026 | Estimate |
| Fire Protection | May 2026 – Jun 2026 | Window passed (est.) |
| Signage and Wayfinding | Jun 2026 – Aug 2026 | Window passed (est.) |
| Insulation | May 2026 – Jun 2026 | Window passed (est.) |
| Drywall | May 2026 – Jun 2026 | Window passed (est.) |
| Low Voltage and Data | May 2026 – Jun 2026 | Window passed (est.) |
| Tile | May 2026 – Jul 2026 | Window passed (est.) |
| Cabinetry and Millwork | May 2026 – Jun 2026 | Window passed (est.) |
| Flooring | May 2026 – Jul 2026 | Window passed (est.) |
| Countertops | May 2026 – Jul 2026 | Window passed (est.) |
| Finish Carpentry | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1484 Brooklyn Avenue, Brooklyn: 4-Storey Apartment Building
- 1482 Brooklyn Avenue, Brooklyn: 4-Storey Apartment Building
- 35-20 24 Street, Queens: Apartment Building Renovation
- 300 Park Avenue South, Manhattan: Retail Building Renovation
- 206 Lenox Avenue, Manhattan: Two-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 158 West 27 Street, Manhattan?
Retail Building Renovation. In existing physical culture establishment in cellar, 1st and 2nd floor. minor partition work, counter work, and plumbing work. replace store front glazing with operable window approximately 5 feet wide. no change to existing use, egress and occupancy
When was the permit issued for 158 West 27 Street, Manhattan?
March 18, 2026, by New York City.
Who is building 158 West 27 Street, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 158 West 27 Street, Manhattan need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.