222 Gerrard St E, Toronto: Residential Project Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Residential Project Renovation at 222 Gerrard St E, Toronto was permitted on September 18, 2025 with a stated construction value of $1M to $5M. Proposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a residential unit on the second floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address222 Gerrard St E, Toronto
NeighbourhoodMoss Park
ProjectResidential Project Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedSeptember 18, 2025
Stated construction value$1M to $5M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a residential unit on the second floor”

Where this project is

  1. June 8, 2023Addition or alteration: structural work
  2. July 13, 2023Mechanical: structural work
  3. September 18, 2025Addition or alteration: Residential Project Renovation · $1M to $5M (this page)
  4. September 18, 2025Mechanical
  5. September 18, 2025Plumbing
  6. October 2025Estimated construction start (estimate)
  7. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more renovations within 1 km

  • 285 Queen St EConditional Permit · $100M to $250M · May 2026
  • 325 Gerrard St EAddition or alteration: excavation and shoring · $100M to $250M · November 2025
  • 227 Gerrard St ENew building · $25M to $50M · October 2025
  • 285 Shuter StAddition or alteration: plumbing · $1M to $5M · January 2026
  • 275 Shuter StAddition or alteration: structural work · $1M to $5M · April 2026

15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2025 – Oct 2026Estimate
Construction Site SecuritySep 2025 – Dec 2025Window passed (est.)
PaintingNov 2025 – Feb 2026Window passed (est.)
MasonryOct 2025 – Dec 2025Window passed (est.)
WaterproofingOct 2025 – Dec 2025Window passed (est.)
RoofingNov 2025 – Feb 2026Window passed (est.)
Windows, Doors and GlazingNov 2025 – Jan 2026Window passed (est.)
ElectricalDec 2025 – Feb 2026Window passed (est.)
HVAC and MechanicalDec 2025 – Feb 2026Window passed (est.)
PlumbingNov 2025 – Feb 2026Window passed (est.)
Fire ProtectionDec 2025 – Feb 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (October 2025) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 222 Gerrard St E?

Residential Project Renovation. Proposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a residential unit on the second floor

When was the permit issued for 222 Gerrard St E?

September 18, 2025, by the City of Toronto.

Who is building 222 Gerrard St E?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 222 Gerrard St E need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.