224 York Street, Brooklyn, New York City: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Apartment Building Renovation at 224 York Street, Brooklyn, New York City was permitted on August 14, 2026 with a stated construction value of under $1M. These drawings show the support of excavation system required forthe construction of the proposed hudson-york (nycha) receivingshaft for new 138kv transmission feeders. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address224 York Street, Brooklyn, New York City
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedAugust 14, 2026
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “These drawings show the support of excavation system required forthe construction of the proposed hudson-york (nycha) receivingshaft for new 138kv transmission feeders”

Where this project is

  1. June 16, 2026Alteration: crane or hoist
  2. August 14, 2026Alteration: Apartment Building Renovation · under $1M (this page)
  3. August 2026Estimated construction start (estimate)
  4. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 71 Prince Street, BrooklynNew building · $100M to $250M · June 2026
  • 99 Fleet Place, BrooklynNew construction · $25M to $50M · August 2026
  • 360 Adams Street, BrooklynAlteration: facade work · $10M to $25M · April 2026
  • 55 Water Street, BrooklynAlteration · $10M to $25M · April 2026
  • 126 Myrtle Avenue, BrooklynAlteration CO: structural work · $10M to $25M · July 2026

33 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 6 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Mar 2027Estimate
Excavation and Site WorkAug 2026Window passed (est.)
Construction Site SecurityAug 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Oct 2026Approach now
FramingAug 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 224 York Street, Brooklyn?

Apartment Building Renovation. These drawings show the support of excavation system required forthe construction of the proposed hudson-york (nycha) receivingshaft for new 138kv transmission feeders

When was the permit issued for 224 York Street, Brooklyn?

August 14, 2026, by New York City.

Who is building 224 York Street, Brooklyn?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 224 York Street, Brooklyn need now?

Estimated as of October 2026, the trades to approach now are elevator, framing and painting. Already passed: excavation and site work; site security; concrete; structural steel; masonry; waterproofing.