43-22 50 Street, Queens, New York City: Office and Tenant Fit-Out
Follow this project · we email you when its status or build stage changes

Office and Tenant Fit-Out at 43-22 50 Street, Queens, New York City was permitted on August 21, 2026 with a stated construction value of under $1M. Renovation to existing commercial bank per plan. Replace interior floor finishes, dropped ceilings and lighting. Partition work. New conference room. Replace exterior entry door. No change to use, egress or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 43-22 50 Street, Queens, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | August 21, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Rush Hour Construction Co See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Renovation to existing commercial bank per plan. Replace interior floor finishes, dropped ceilings and lighting. Partition work. New conference room. Replace exterior entry door. No change to use, egress or occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 21, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- September 3, 2026Alteration: mechanical · under $1M
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 58-01 Queens Boulevard, QueensNew building · $10M to $25M · April 2026
- 43-25 52 Street, QueensNew building · $5M to $10M · September 2026
- 54-21 Roosevelt Avenue, QueensNew construction · $1M to $5M · March 2026
- 59-40 Queens Boulevard, QueensAlteration · $1M to $5M · October 2026
- 40-01 43 Avenue, QueensInterior alteration · $1M to $5M · March 2026
10 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Rush Hour Construction Co has 3 other projects in Builtie
- New York City · Interior alteration · under $1M · 2026
- New York · Mechanical · 2026
- New York · Structural · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now, 2 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 – Sep 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Construction Site Security leads in New York City · Structural Steel leads in New York City · Elevators leads in New York City · Framing leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 58 Avenue A, Manhattan: Apartment Building Renovation
- 199-06 Epsom Course, Queens: Single-Family House Renovation
- 3990 Hylan Boulevard, Staten Island: Commercial Project Renovation
- 15 Watts Street, Manhattan: Office and Tenant Fit-Out
- 243 East 48 Street, Manhattan: Single-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 43-22 50 Street, Queens?
Office and Tenant Fit-Out. Renovation to existing commercial bank per plan. Replace interior floor finishes, dropped ceilings and lighting. Partition work. New conference room. Replace exterior entry door. No change to use, egress or occupancy
When was the permit issued for 43-22 50 Street, Queens?
August 21, 2026, by New York City.
Who is building 43-22 50 Street, Queens?
Rush Hour Construction Co is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 43-22 50 Street, Queens need now?
Estimated as of October 2026, the trades to approach now are site security, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work; concrete.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
