58 Avenue A, Manhattan, New York City: Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

Apartment Building Renovation at 58 Avenue A, Manhattan, New York City was permitted on April 8, 2026 with a stated construction value of under $1M. Deferred maintenance of existing apartments including the removal and installation ofnonload bearing partitions, new kitchen cabinets throughout apartments as indicated onthe drawings filed herein. no change of use, occupancy or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 58 Avenue A, Manhattan, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | April 8, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Deferred maintenance of existing apartments including the removal and installation ofnonload bearing partitions, new kitchen cabinets throughout apartments as indicated onthe drawings filed herein. no change of use, occupancy or egress”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- April 8, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- April 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 154 Broome Street, ManhattanInterior alteration · $10M to $25M · March 2026
- 64 Essex Street, ManhattanInterior alteration · $10M to $25M · March 2026
- 189 Allen Street, ManhattanInterior alteration · $10M to $25M · March 2026
- 295 Lafayette Street, ManhattanInterior alteration · $5M to $10M · May 2026
- 280 East Houston Street, ManhattanNew building · $5M to $10M · June 2026
39 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Nov 2026 | Estimate |
| Construction Site Security | Apr 2026 – May 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | Apr 2026 – May 2026 | Window passed (est.) |
| Waterproofing | Apr 2026 – May 2026 | Window passed (est.) |
| Roofing | May 2026 – Jun 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jun 2026 | Window passed (est.) |
| Electrical | May 2026 – Jul 2026 | Window passed (est.) |
| HVAC and Mechanical | May 2026 – Jul 2026 | Window passed (est.) |
| Plumbing | May 2026 – Jul 2026 | Window passed (est.) |
| Fire Protection | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 43-22 50 Street, Queens: Office and Tenant Fit-Out
- 199-06 Epsom Course, Queens: Single-Family House Renovation
- 3990 Hylan Boulevard, Staten Island: Commercial Project Renovation
- 15 Watts Street, Manhattan: Office and Tenant Fit-Out
- 243 East 48 Street, Manhattan: Single-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 58 Avenue A, Manhattan?
Apartment Building Renovation. Deferred maintenance of existing apartments including the removal and installation ofnonload bearing partitions, new kitchen cabinets throughout apartments as indicated onthe drawings filed herein. no change of use, occupancy or egress
When was the permit issued for 58 Avenue A, Manhattan?
April 8, 2026, by New York City.
Who is building 58 Avenue A, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 58 Avenue A, Manhattan need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.