56 West 12 Street, Manhattan, New York City: Duplex Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Duplex Renovation at 56 West 12 Street, Manhattan, New York City was filed with New York City on March 12, 2026 with a stated construction value of under $1M; the filing was later withdrawn (DOB status: Filing Withdrawn). Renovation or addition to a duplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address56 West 12 Street, Manhattan, New York City
ProjectDuplex Renovation
Building typeResidential
WorkRenovation or alteration
Filed with the cityMarch 12, 2026
City statusWithdrawn (DOB status: Filing Withdrawn)
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. March 12, 2026Alteration: Duplex Renovation · under $1M (this page)
  2. March 12, 2026Alteration: excavation and shoring · under $1M
  3. March 19, 2026Alteration: foundation · under $1M
  4. September 24, 2026Alteration: demolition · under $1M
  5. September 24, 2026Alteration: plumbing · under $1M
  6. October 6, 2026Alteration: roofing · under $1M
  7. April 2026Estimated construction start (estimate)
  8. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

101 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 11 other projects in Builtie

  • New York City · Interior alteration · $5M to $10M · 2026
  • New York City · Alteration CO: conversion to residential · $1M to $5M · 2026
  • New York City · Alteration: mechanical · under $1M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Oct 2026Estimate
Construction Site SecurityMar 2026 – May 2026Window passed (est.)
PaintingApr 2026 – Jun 2026Window passed (est.)
MasonryApr 2026 – May 2026Window passed (est.)
WaterproofingApr 2026 – May 2026Window passed (est.)
RoofingApr 2026 – Jun 2026Window passed (est.)
Windows, Doors and GlazingApr 2026 – May 2026Window passed (est.)
ElectricalMay 2026 – Jun 2026Window passed (est.)
HVAC and MechanicalMay 2026 – Jun 2026Window passed (est.)
PlumbingApr 2026 – Jun 2026Window passed (est.)
Fire ProtectionMay 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 56 West 12 Street, Manhattan?

Duplex Renovation. Renovation or addition to a duplex.

Has 56 West 12 Street, Manhattan been permitted?

No. The work was filed with New York City on March 12, 2026 and the filing was later withdrawn (DOB status: Filing Withdrawn).

Who is building 56 West 12 Street, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 56 West 12 Street, Manhattan need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.